Breaking News

Attention Attention Travelers On Sodawas-Nuh Highway, Route Changed Due To Work On Railway Overbridge.

N
Nitu Kumari
Contributor
February 14, 2026

Restriction on movement of vehicles for ROB construction. file photo

Know the main points and gist of the news at a glance

Communication Assistant, Bhiwadi (Rewari). The construction work of Railway Over Bridge (ROB) is in progress at Railway Level Crossing No. 86 (LC-86) located on Sodawas-Nuh State Highway-108. This work is being done by the Public Works Department (PWD), Khairthal under the supervision of Railway Department.

Piling (foundation) work will soon be started in the railway portion of the ROB, under which heavy machinery will be operated and deep digging will be done in the railway border area.

Considering the nature of the construction work, in order to ensure the safety of the general public and workers, it has been decided to temporarily keep level crossing number 86 completely closed for all types of vehicles.

During this period, alternative routes will have to be used for traffic. Necessary guidelines have been issued to the police administration and related departments, so that the traffic system can be operated smoothly on alternative routes.

The district administration has appealed to the citizens to use alternative routes within the stipulated period and cooperate by following the instructions issued by the administration.

Also read- Construction of Chattargarhpatti Railway Overbridge started in Sirsa, 200 meter long bridge will be built at a cost of Rs 10.75 crore.

Chyawanprash is a part of every Indian's life, it reduces diseases and increases energy.

Share this news